Location: Lynwood, NSW
Services: HV & LV Engineering, Construction and Commissioning including HV switching and Isolation’s
Precept was invited by BMD Group to provide the electrical installation works for a 22kV HV Distribution System for a Greenfield site, the Holcim Lynwood Quarry Development site in NSW.
The raw material processing plant and distribution centre included a rail loading facility adjacent to the new rock crushing plant as part of the development of the 5mtpa quarry from Greenfield to Turnkey.
The works included installation, testing and commissioning of all electrical, maintaining both the satisfaction of the Principal and compliance with all statutory bodies having jurisdiction over the site.
The scope included:
- Cabling and cabling support systems
- Installation of the free issued equipment
- Cabling terminations and point to point testing
- Earthing design and installation
- Load out
- Lighting and general purpose power installation
- As built documentation and manuals